Rowellyn Park Primary School, Carrum Downs, VIC

client

Department of Education & Training, Victoria

status

Tender

value

confidential

role

Architect, Interior Designer, Contract Administrator

  • / GYM GFA: 1180m2
  • / Education New Build
  • / S.T.E.M. CENTRE GFA: 569m2
  • / Education Upgrade

Provided for in this stage of the 5-year master plan is a new 860sqm competition size indoor basketball court and a S.T.E.M (Science, Technology, Engineering and Mathematics) center. The new gymnasium/basketball court will house sports, PE, school productions and assemblies. Natural filtered light floods into the building through a high-level polycarbonate facade. The former gymnasium has been repurposed into a state-of-the-art S.T.E.M center complete with food technology kitchens, and a mezzanine level floating in the voluminous hall. Large projection walls and open plan teaching spaces will provide for truly versatile and collaborative learning spaces, to house a progressive, technologically based, learning curriculum.

back to projects

© AOA Christopher Peck 2020

Office 1.5 / 2 Collins St, Melbourne VIC 3000

P (03) 9041 0613

[email protected]